|
This is the first entry of the blog. The blog will be updated on a semi-regular basis to keep everyone informed of activities around the GMRC.
Our benchwork is 100% complete and track laying is about 25% complete. We have a target to complete at least one main loop around the lower level by Gilbert Days 2010.
The entire benchwork was completed in a modular fashion to provide some flexibility should it be needed later.
We are using homosote/homobed under all track and this will allow significant sound control once everything is in place.
Train controls are NCE with a separate power feed for switch machines.
Lanscaping is underway for Gilbert, Williams Field, Queen Creek and the feed to Drake. Other areas available for interested parties are: Wickenburg, Prescott, Glendale, Mesa and Tempe.
Take a look at the photos section for an idea of our progress.
Thanks for looking into the GMRC. |
||


