|
Well, another month has flown by and the club continues to make progress. We have nearly completed the track in the Santa Fe yard, and have a layout for the engine maintenance area. Phoenix Union Station area is starting to take shape and the entrance from both the SF and the SP yards are in place.
Most of the lower level Santa Fe track is in place and available for a small operating session. THe club has also upgraded its control system to include wireless units that respond as quickly as the tethered units.
Tempe Salt River crossing into Phoenix is under development and soon may be laying track through Phoenix to link up with the Union Station yard.
Layout photos are also being updated to show much of this development. |
||


